Skip to main content

Infrastructure construction measurements (5 cr)

Code: TX00CH96-3010

General information


Enrollment
02.05.2023 - 27.08.2023
Registration for the implementation has ended.
Timing
28.08.2023 - 17.12.2023
Implementation has ended.
Number of ECTS credits allocated
5 cr
Local portion
5 cr
Mode of delivery
On-campus
Unit
(2019-2024) School of Real Estate and Construction
Campus
Myllypurontie 1
Teaching languages
Finnish
Degree programmes
Civil Engineering

Implementation has 12 reservations. Total duration of reservations is 48 h 0 min.

Time Topic Location
Thu 31.08.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
Online
Thu 07.09.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 14.09.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 21.09.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 28.09.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 05.10.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 26.10.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 02.11.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 09.11.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 16.11.2023 time 10:00 - 14:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Thu 23.11.2023 time 10:00 - 14:00
(4 h 0 min)
KOE: Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
MPA5018 Oppimistila
Wed 29.11.2023 time 13:00 - 17:00
(4 h 0 min)
Infrarakentamisen mittaukset TX00CH96-3010
MPAK020 Rakennuslaboratorio
Changes to reservations may be possible.

Objective

Students acquire a broad understanding of construction surveying related to infrastructure projects. After completing the course, students master a wide range of ways to use the total station and the GPS hardware.Students will become familiar with BIM and machine control in infrastructure projects

Content

Use of robotic total station
Use of total station in a versatile way for structure mapping and position measurement
Use of GPS equipment
Use of total station jointly with GPS equipment.
Load measurements
BIM and machine control applications.

Evaluation scale

0-5

Assessment criteria, satisfactory (1)

The assessment focuses on the student’s work during the course as well as the acquired skills at the end of the course.
Weighting of exams:
- 50%: theoretical exam
- 50%: use test of the total station.

Satisfactory (1-2)
The student knows the basics of the different aspects of total station and GPS measurements and load measurement that BIM and machine control. The student is required to complete the use test of the total station in the given maximum time and within the given precision tolerance.

Assessment criteria, good (3)

The student masters most of the different aspects of total station and GPS measurements and load measurement that BIM and machine control. The student is required to complete the use test of the total station within the average value of the minimum and maximum time limits and within the given precision tolerance.

Assessment criteria, excellent (5)

The student has a versatile competence in the different aspects of total station and GPS measurements and load measurement that BIM and machine control. The student is required to complete the use test of the total station within the minimum time and the given precision tolerance.

Assessment criteria, approved/failed

The assessment focuses on the student’s work during the course as well as the acquired skills at the end of the course.
Weighting of exams:
- 50%: theoretical exam
- 50%: use test of the total station.

Satisfactory (1-2)
The student knows the basics of the different aspects of total station and GPS measurements and load measurement that BIM and machine control. The student is required to complete the use test of the total station in the given maximum time and within the given precision tolerance.

Qualifications

No

Further information

The course involves laboratory work in groups, including practical measurement exercises with measuring equipment, with emphasis on measurements with different variety of total stations and GPS devices, as well as a variety of related calculation exercises.
The laboratory provides also capacity measurements with the measurement equipment.

No literature is required. The material consists of the contents of the theory sessions and the student’s notes.
In the laboratory, the teaching material consists of different measuring devices, notes and instructions written on the board, and exercises done with the measuring devices.

For the laboratory sessions you should dress according to the weather and prepare to be outdoors for up to one hour. In heavy rain we do not do outdoor measurements.
However, cold weather is not an obstacle to surveying, so dress according to the weather!

Go back to top of page