Skip to main content

Scheduling and Planning Construction Site Case Study (5 cr)

Code: TM00BS41-3016

General information


Enrollment
28.11.2022 - 08.01.2023
Registration for the implementation has ended.
Timing
09.01.2023 - 02.04.2023
Implementation has ended.
Number of ECTS credits allocated
5 cr
Local portion
5 cr
Mode of delivery
On-campus
Unit
(2019-2024) School of Real Estate and Construction
Campus
Myllypurontie 1
Teaching languages
Finnish
Degree programmes
Degree Programme in Construction Site Management
Teachers
Aamos Lemström
Groups
TXI21S2
Rakennusalan työnjohdon tutkinto-ohjelma monimuoto
Course
TM00BS41

Implementation has 9 reservations. Total duration of reservations is 34 h 0 min.

Time Topic Location
Thu 02.03.2023 time 09:00 - 13:00
(4 h 0 min)
Ryhmäkohtainen excursiovaraus, ei lähiopetusta Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016
Mon 06.03.2023 time 09:00 - 13:00
(4 h 0 min)
Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016
MPA2018a Digitila
MPA2018b Digitila
MPA2018c Digitila
Tue 07.03.2023 time 09:00 - 13:00
(4 h 0 min)
Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016
MPA4016b Digitila
MPA4016c Digitila
Wed 08.03.2023 time 09:00 - 12:00
(3 h 0 min)
Aikataulu- ja työnsuunnittelusovellus
MPA1010 Metropolia-sali
Thu 09.03.2023 time 09:00 - 13:00
(4 h 0 min)
Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016
MPA4016b Digitila
MPA4016c Digitila
Mon 13.03.2023 time 13:00 - 17:00
(4 h 0 min)
VARATUNTI: Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016
MPA0001 Bunkkeri
Wed 15.03.2023 time 09:00 - 12:00
(3 h 0 min)
Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016, Aikataulu- ja työnsuunnittelusovellus TX00BT05-3007
MPA1010 Metropolia-sali
Fri 17.03.2023 time 08:00 - 12:00
(4 h 0 min)
VARA TUNTI: Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016
MPA4016b Digitila
MPA4016c Digitila
Fri 17.03.2023 time 13:00 - 17:00
(4 h 0 min)
VARA TUNTI: Aikataulu- ja työnsuunnittelusovellus TM00BS41-3016
MPA0001 Bunkkeri
Changes to reservations may be possible.

Objective

The student is able to use his/her basic knowledge in production planning of a project and gets familiar with implementing in production.

Content

The project scheduling, quality planning, cost management, managing drawings and other technical data, procurement, facilities and machinery, occupational safety and assembly planning of elements.

Evaluation scale

0-5

Assessment criteria, satisfactory (1)

The student is able to create the most important production plans individually or by instructions in team.

Assessment criteria, good (3)

The student is able to create the most important production plans individually or in team.

Assessment criteria, excellent (5)

The student is able to create the most important production plans individually or in team and is able to develop production management regarding economical, quality, and functional issues.

Assessment criteria, approved/failed

The student is able to create the most important production plans individually or by instructions in team.

Qualifications

TX00EB47 Basics of House Building
TM00BS35 Basics of Construction
TM00BS36 Scheduling and planning of Construction
TM00FE83 Basics of Construction

Go back to top of page