Renovation Site Work Planning (5 cr)
Code: TM00ED80-3007
General information
- Enrollment
-
02.12.2024 - 12.01.2025
Registration for the implementation has ended.
- Timing
-
13.01.2025 - 25.05.2025
Implementation is running.
- Number of ECTS credits allocated
- 5 cr
- Local portion
- 5 cr
- Mode of delivery
- On-campus
- Unit
- Kiinteistö- ja rakennusala
- Campus
- Myllypurontie 1
- Teaching languages
- Finnish
- Degree programmes
- Degree Programme in Construction Site Management
- Teachers
- Sakari Pesonen
- Groups
-
TXI23S2BRakennusalan työnjohdon tutkinto-ohjelma monimuoto, talonrakennustekniikka
- Course
- TM00ED80
Implementation has 8 reservations. Total duration of reservations is 20 h 0 min.
Time | Topic | Location |
---|---|---|
Thu 16.01.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Thu 23.01.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Thu 30.01.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Thu 06.02.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Thu 13.02.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Thu 27.02.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Thu 06.03.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Thu 13.03.2025 time 13:30 - 16:00 (2 h 30 min) |
Korjausrakentamisen työnsuunnittelu TM00ED80-3007 |
MPA4018
Oppimistila
|
Objective
On completion of the course the student can
- manage a renovation project following the principles of project management
- plan the schedule, tasks and work arrangements
- act according to the risk management plan related to the project
- list methods, machinery and work arrangements related to different repair works
- plan on-site arrangements and logistics
- take care of customer communications and informing residents
- select suitable methods of weather protection and dust control at the renovation site
- implement a moisture management on site.
- explain safety risks of repair works as well as methods to improve occupational safety
- name renovation methods for facades, roof and foundation structures
- name repair methods for bath rooms and plumbing
Content
Work methods of typical repair works, equipment and work arrangements, demolition work, facade, roof and balcony repair, foundation repair, pipe rehabilitation, bath room repair.
Repair options for precast concrete facades and related products
Corrosion prevention
Load-bearing concrete repair, structural strengthening
On-site arrangements and logistics
Resident and customer arrangements
Scheduling, task planning and work arrangements
Environmental considerations and occupational safety
Weather protection
Dust control and cleaning
Moisture management
Evaluation scale
0-5
Assessment criteria, satisfactory (1)
The student is able to
- list the special features related to the work implementation of the repair construction site
- explain the stages of demolition work on site
- explain the stages of construction site implementation of facade, water roof and balcony repairs and choose a suitable repair method
- explain the stages of the site implementation of the repair of the foundation structures and choose a suitable repair method
- explain the stages of construction site implementation of line renovation and wet room repair and choose a suitable repair method
- explain the stages of construction site implementation of repairs to surface structures
- list strengthening methods of load-bearing reinforced concrete structures
- prepare a repair construction work plan for a small repair building work
- explain the occupational safety risks of a renovation construction site and methods to improve occupational safety and analyze occupational safety plans
- implement moisture management at the construction site
Assessment criteria, good (3)
In addition to the previous skill requirements, the student is able to
- analyze special features based on the demand and scope of the repair construction work
- explain the stages of demolition work on site
- prepare a repair construction work plan for a small repair job
Assessment criteria, excellent (5)
In addition to the previous skill requirements, the student is able to
- prepare a task plan for the repair construction work for a wider repair work
- take into account occupational safety and environmental safety of repair construction work in a demanding repair work
- implement moisture management at the construction site and choose suitable protection methods
Assessment criteria, approved/failed
The student is able to
- list the special features related to the work implementation of the repair construction site
- explain the stages of demolition work on site
- explain the stages of construction site implementation of facade, water roof and balcony repairs and choose a suitable repair method
- explain the stages of the site implementation of the repair of the foundation structures and choose a suitable repair method
- explain the stages of construction site implementation of line renovation and wet room repair and choose a suitable repair method
- explain the stages of construction site implementation of repairs to surface structures
- list strengthening methods of load-bearing reinforced concrete structures
- prepare a repair construction work plan for a small repair building work
- explain the occupational safety risks of a renovation construction site and methods to improve occupational safety and analyze occupational safety plans
- implement moisture management at the construction site