Skip to main content

Concrete Technology 2 (5 cr)

Code: TX00CH95-3024

General information


Enrollment
06.05.2024 - 25.08.2024
Registration for the implementation has ended.
Timing
26.08.2024 - 31.12.2024
Implementation has ended.
Number of ECTS credits allocated
5 cr
Local portion
5 cr
Mode of delivery
On-campus
Unit
(2019-2024) School of Real Estate and Construction
Campus
Myllypurontie 1
Teaching languages
Finnish
Degree programmes
Civil Engineering
Teachers
Juha Virtanen
Course
TX00CH95

Implementation has 11 reservations. Total duration of reservations is 33 h 45 min.

Time Topic Location
Wed 28.08.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 04.09.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 11.09.2024 time 12:30 - 16:00
(3 h 30 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 25.09.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 02.10.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 09.10.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 23.10.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 30.10.2024 time 12:30 - 15:45
(3 h 15 min)
Betonitekniikka 2 TX00CH95-3024
MPA3015 Oppimistila
Wed 06.11.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 13.11.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Wed 20.11.2024 time 12:30 - 15:30
(3 h 0 min)
Betonitekniikka 2 TX00CH95-3024
MPC4001 Oppimistila
Changes to reservations may be possible.

Objective

After the course the student has the knowledge of:
- Execution quality and authority requirements of concrete structures both in-situ and pre-cast element construction
- Execution of pre-cast elements and installation
- Concrete structures and controlling of drying and shrinkage
- Concrete works (in-situ) design and management
- Concreting plan preparation and execution records
- Concrete floors; concreting and quality requirements
- Surface finish requirements and factors affecting the surface finish quality
- Concreting with special methods
- Controlling of special concretes
- Management of concrete works on structure class 2

Content

- Refresh content from the course Concrete Technology 1
- Execution quality and authority requirements of concrete structures,
pre-cast element construction
- Concrete type selection based on structure and conditions (environment, weather)
- Formwork technology
- Concreting in cold weather; required actions
- Concreting of floors; required actions
- Concreting with special methods
- Special concretes
- Concreting plan preparation
- Excursions to in-situ buildings sites and pre-cast element factories

Evaluation scale

0-5

Assessment criteria, satisfactory (1)

After the course the student has the knowledge of:
- Recognition of quality and authority requirements for pre-cast element construction
- Installation and quality issues for pre-cast elements
- Management of design and execution for concrete works, in-situ and pre-cast element construction
- Preform concreting plan preparation and execution records
- Recognition and itemizing of required actions for concreting in cold weather
- Management and design of floor concrete works and itemize quality requirements
- Recognition of surface finish requirements and factors affecting the surface finish quality
- Management of concrete works on structure class 2

Assessment criteria, good (3)

The students knows well aforementioned items

Assessment criteria, excellent (5)

The students knows excellently aforementioned items

Assessment criteria, approved/failed

After the course the student has the knowledge of:
- Recognition of quality and authority requirements for pre-cast element construction
- Installation and quality issues for pre-cast elements
- Management of design and execution for concrete works, in-situ and pre-cast element construction
- Preform concreting plan preparation and execution records
- Recognition and itemizing of required actions for concreting in cold weather
- Management and design of floor concrete works and itemize quality requirements
- Recognition of surface finish requirements and factors affecting the surface finish quality
- Management of concrete works on structure class 2

Qualifications

-

Further information

-

Go back to top of page