Concrete Technology 2 (5 cr)
Code: TX00CH95-3024
General information
- Enrollment
-
06.05.2024 - 25.08.2024
Registration for the implementation has ended.
- Timing
-
26.08.2024 - 31.12.2024
Implementation has ended.
- Number of ECTS credits allocated
- 5 cr
- Local portion
- 5 cr
- Mode of delivery
- On-campus
- Unit
- (2019-2024) School of Real Estate and Construction
- Campus
- Myllypurontie 1
- Teaching languages
- Finnish
- Degree programmes
- Civil Engineering
- Teachers
- Juha Virtanen
- Course
- TX00CH95
Implementation has 11 reservations. Total duration of reservations is 33 h 45 min.
Time | Topic | Location |
---|---|---|
Wed 28.08.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 04.09.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 11.09.2024 time 12:30 - 16:00 (3 h 30 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 25.09.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 02.10.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 09.10.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 23.10.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 30.10.2024 time 12:30 - 15:45 (3 h 15 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPA3015
Oppimistila
|
Wed 06.11.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 13.11.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Wed 20.11.2024 time 12:30 - 15:30 (3 h 0 min) |
Betonitekniikka 2 TX00CH95-3024 |
MPC4001
Oppimistila
|
Objective
After the course the student has the knowledge of:
- Execution quality and authority requirements of concrete structures both in-situ and pre-cast element construction
- Execution of pre-cast elements and installation
- Concrete structures and controlling of drying and shrinkage
- Concrete works (in-situ) design and management
- Concreting plan preparation and execution records
- Concrete floors; concreting and quality requirements
- Surface finish requirements and factors affecting the surface finish quality
- Concreting with special methods
- Controlling of special concretes
- Management of concrete works on structure class 2
Content
- Refresh content from the course Concrete Technology 1
- Execution quality and authority requirements of concrete structures,
pre-cast element construction
- Concrete type selection based on structure and conditions (environment, weather)
- Formwork technology
- Concreting in cold weather; required actions
- Concreting of floors; required actions
- Concreting with special methods
- Special concretes
- Concreting plan preparation
- Excursions to in-situ buildings sites and pre-cast element factories
Evaluation scale
0-5
Assessment criteria, satisfactory (1)
After the course the student has the knowledge of:
- Recognition of quality and authority requirements for pre-cast element construction
- Installation and quality issues for pre-cast elements
- Management of design and execution for concrete works, in-situ and pre-cast element construction
- Preform concreting plan preparation and execution records
- Recognition and itemizing of required actions for concreting in cold weather
- Management and design of floor concrete works and itemize quality requirements
- Recognition of surface finish requirements and factors affecting the surface finish quality
- Management of concrete works on structure class 2
Assessment criteria, good (3)
The students knows well aforementioned items
Assessment criteria, excellent (5)
The students knows excellently aforementioned items
Assessment criteria, approved/failed
After the course the student has the knowledge of:
- Recognition of quality and authority requirements for pre-cast element construction
- Installation and quality issues for pre-cast elements
- Management of design and execution for concrete works, in-situ and pre-cast element construction
- Preform concreting plan preparation and execution records
- Recognition and itemizing of required actions for concreting in cold weather
- Management and design of floor concrete works and itemize quality requirements
- Recognition of surface finish requirements and factors affecting the surface finish quality
- Management of concrete works on structure class 2
Qualifications
-
Further information
-