Cost Management of Building Construction (5 cr)
Code: TM00BS38-3017
General information
- Enrollment
-
27.11.2023 - 14.01.2024
Registration for the implementation has ended.
- Timing
-
15.01.2024 - 31.03.2024
Implementation has ended.
- Number of ECTS credits allocated
- 5 cr
- Local portion
- 5 cr
- Mode of delivery
- On-campus
- Unit
- (2019-2024) School of Real Estate and Construction
- Campus
- Myllypurontie 1
- Teaching languages
- Finnish
- Seats
- 0 - 70
- Degree programmes
- Degree Programme in Construction Site Management
- Teachers
- Joonas Pusila
- Course
- TM00BS38
Implementation has 20 reservations. Total duration of reservations is 80 h 45 min.
Time | Topic | Location |
---|---|---|
Wed 17.01.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA4015
Luentosali
|
Wed 17.01.2024 time 13:15 - 15:30 (2 h 15 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA4010
Oppimistila
|
Wed 24.01.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA4010
Oppimistila
|
Wed 24.01.2024 time 13:15 - 16:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA3007
Oppimistila
|
Wed 31.01.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA4010
Oppimistila
|
Wed 31.01.2024 time 13:15 - 16:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPC4011
Oppimistila
|
Mon 05.02.2024 time 09:15 - 16:00 (6 h 45 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5023
Oppimistila
|
Wed 07.02.2024 time 09:15 - 16:00 (6 h 45 min) |
Kustannuslaskenta TM00BS38-3017 |
MPC4011
Oppimistila
|
Wed 14.02.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
Etäopetus
|
Wed 14.02.2024 time 13:15 - 16:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
Etäopetus
|
Mon 26.02.2024 time 09:15 - 16:45 (7 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5023
Oppimistila
|
Wed 28.02.2024 time 09:15 - 16:45 (7 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5018
Oppimistila
|
Wed 06.03.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPC5012
Oppimistila
|
Wed 06.03.2024 time 13:15 - 15:00 (1 h 45 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5015
Oppimistila
|
Wed 13.03.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5023
Oppimistila
|
Wed 13.03.2024 time 13:15 - 16:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5025
Oppimistila
|
Wed 20.03.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPB6023
Oppimistila
|
Wed 20.03.2024 time 13:15 - 16:00 (2 h 45 min) |
Kustannuslaskenta TM00BS38-3017 |
Etäopetus
|
Wed 27.03.2024 time 09:15 - 12:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5025
Oppimistila
|
Wed 27.03.2024 time 13:15 - 16:45 (3 h 30 min) |
Kustannuslaskenta TM00BS38-3017 |
MPA5025
Oppimistila
|
Objective
On completion of the course, the student can create a cost estimate based on man-hour consumption. The student can use a target cost budget
in task planning, supervising a task, controlling the site expenses and registering realised costs. The student can participate in competitive bidding using the usual documents, and in controlling project costs.
The student is able to use IT in cost estimation and cost control.
Content
1. Introduction
2. Cost management in a construction project
3. Items and calculation rules
4. Cost estimation and preparation of offers
5. Cost control
Evaluation scale
0-5
Assessment criteria, satisfactory (1)
On completion of the course the student
- can list main aspects of cost control in a building construction project
- can explain the progress of competitive bidding
- can categorize types of costs at a site
- can list the phases of cost control at a site
- can work out cost calculations based on construction resources.
Assessment criteria, good (3)
In addition to the requirements listed above, the student
- can explain the principles of cost control at a site
- can perform task based cost controlling
- can describe the process of competitive bidding and related documents
- explain the how offers are calculated.
Assessment criteria, excellent (5)
In addition to the requirements listed above, the student
- can perform comparison calculations to be used in site supervision
- can estimate the cost effects of changes to work methods or schedules at a site
- can describe the overall cost structure of a site and calculate a cost estimate
- can use IT applications in cost calculations and site supervision.
Assessment criteria, approved/failed
On completion of the course the student
- can list main aspects of cost control in a building construction project
- can explain the progress of competitive bidding
- can categorize types of costs at a site
- can list the phases of cost control at a site
- can work out cost calculations based on construction resources.
Qualifications
TX00EB47 Basics of House Building:
TM00BS35 Basics of Construction:
TM00BS36 Scheduling and Planning of Construction