Renovation 2 (5 ECTS)
Code: TX00BK77-3012
General information
- Enrollment
- 02.05.2023 - 27.08.2023
- Registration for the implementation has ended.
- Timing
- 28.08.2023 - 17.12.2023
- Implementation has ended.
- Number of ECTS credits allocated
- 5 ECTS
- Mode of delivery
- On-campus
- Campus
- Myllypurontie 1
- Teaching languages
- Finnish
- Seats
- 0 - 50
- Degree programmes
- Civil Engineering
- Teachers
- Anne Aalto
- Course
- TX00BK77
Implementation has 11 reservations. Total duration of reservations is 28 h 0 min.
Time | Topic | Location |
---|---|---|
Mon 28.08.2023 time 09:00 - 12:00 (3 h 0 min) |
Korjausrakentaminen 2 TX00BK77-3012 |
MPB4005
Oppimistila
|
Mon 04.09.2023 time 09:00 - 12:00 (3 h 0 min) |
Korjausrakentaminen 2 TX00BK77-3012 |
MPB4005
Oppimistila
|
Mon 11.09.2023 time 09:00 - 12:00 (3 h 0 min) |
Korjausrakentaminen 2 TX00BK77-3012 |
MPB4005
Oppimistila
|
Mon 18.09.2023 time 09:00 - 12:00 (3 h 0 min) |
Korjausrakentaminen 2 TX00BK77-3012 |
MPB4005
Oppimistila
|
Mon 25.09.2023 time 09:00 - 12:00 (3 h 0 min) |
Korjausrakentaminen 2 TX00BK77-3012 |
MPB4005
Oppimistila
|
Mon 02.10.2023 time 09:00 - 12:00 (3 h 0 min) |
Korjausrakentaminen 2 TX00BK77-3012 |
MPB4005
Oppimistila
|
Mon 09.10.2023 time 09:00 - 12:00 (3 h 0 min) |
Korjausrakentaminen 2 TX00BK77-3012 |
MPB4005
Oppimistila
|
Tue 24.10.2023 time 09:00 - 10:00 (1 h 0 min) |
Luentoja ei enää ole, mutta Zoom-linja on auki ja on mahdollisuus saada neuvoja tehtäviin.Korjausrakentaminen 2 TX00BK77-3012 |
|
Tue 31.10.2023 time 09:00 - 11:00 (2 h 0 min) |
Luentoja ei enää ole, mutta Zoom-linja on auki ja on mahdollisuus saada neuvoja tehtäviin.Korjausrakentaminen 2 TX00BK77-3012 |
|
Tue 07.11.2023 time 09:00 - 11:00 (2 h 0 min) |
Luentoja ei enää ole, mutta Zoom-linja on auki ja on mahdollisuus saada neuvoja tehtäviin.Korjausrakentaminen 2 TX00BK77-3012 |
|
Tue 14.11.2023 time 09:00 - 11:00 (2 h 0 min) |
Luentoja ei enää ole, mutta Zoom-linja on auki ja on mahdollisuus saada neuvoja tehtäviin.Korjausrakentaminen 2 TX00BK77-3012 |
Further information
-
Evaluation scale
0-5
Assessment criteria, satisfactory (1)
The student knows basics about renovation and can
- list special characteristics and risks related to a renovation site
- list suitable renovation methods for typical sites
- interpret renovation construction drawings and simple renovation plans
- make simple renovation plans
- manage simple renovation works
- list occupational safety risks during renovation at the construction site
- list harmful substances commonly encountered in renovation works and techniques for dismantling them
- list weather protection and dust control methods for a renovation site
- list the main contents of moisture management plans.
Assessment criteria, good (3)
The student masters topics related to renovation construction well and can
- list special characteristics and risks related to a renovation site
- list suitable renovation methods for typical sites and choose appropriate methods for different circumstances
- interpret renovation construction drawings and other planning documents
- make a renovation plan for a typical site
- manage renovation works
- list occupational safety risks during renovation at the construction site and choose appropriate methods to prevent problems
- list harmful substances commonly encountered in renovation works and techniques for dismantling them
- list weather protection and dust control methods for a renovation site and choose the appropriate methods for different sites
- list the main contents of a moisture management plan and apply the plan on site.
Assessment criteria, excellent (5)
The student has a broad expertise in the field of renovation and can
- list special characteristics and risks related to a renovation site and compare them with constructing a new building
- list renovation methods for various sites and choose appropriate methods for different circumstances
- interpret renovation construction drawings and other planning documents
- make a renovation plan for a typical site and a more demanding site
- manage renovation works
- list occupational safety risks during renovation at the construction site and choose appropriate methods to prevent problems
- list harmful substances commonly encountered in renovation works and techniques for dismantling them
- choose the correct dismantling method depending on the site
- list weather protection and dust control methods for a renovation site and choose the appropriate methods for different sites
- list the main contents of a moisture management plan and choose the appropriate methods for implementing the plan
- produce a moisture management plan.
Assessment criteria, approved/failed
The student knows basics about renovation and can
- list special characteristics and risks related to a renovation site
- list suitable renovation methods for typical sites
- interpret renovation construction drawings and simple renovation plans
- make simple renovation plans
- manage simple renovation works
- list occupational safety risks during renovation at the construction site
- list harmful substances commonly encountered in renovation works and techniques for dismantling them
- list weather protection and dust control methods for a renovation site
- list the main contents of moisture management plans.